Commissioning
7.3 Putting into operation
28
Operator’s manual | VP | 5100056064 | 02/2020 | [en]
Compaction of asphalt
To avoid cracking and sticking to the asphalt, use water tank with
sprinkler system,
see Accessories on page 41
.
7.3 Putting into operation
WARNING
Danger of burns due to starting aid sprays!
Starting aid sprays can ignite and cause severe burns.
Do not use any starting aid sprays.
1. Move the fuel cock1 into positionA.
B
2. Move choke lever 2 to position A when the engine is cold.
3. Move the choke lever to position B when the engine is warm.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson VP and is the answer not in the manual?

Wacker Neuson VP Specifications

General IconGeneral
BrandWacker Neuson
ModelVP
CategoryConstruction Equipment
LanguageEnglish

Related product manuals