EasyManua.ls Logo

WEG SSW07 Series - Power Connections; Basic Wiring

WEG SSW07 Series
11 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
Power Connections:
The SSW07 Quick Start Guide is a supplement to help get the SSW07 started quickly using the most common installation
and configuration options. This SSW07 Quick Start Guide is not meant to replace the SSW07 User’s Manual. For detailed
instructions, safety precautions, proper mounting, installation, configuration, and operation please refer to the SSW07
User’s Guide. Warning: Only qualified personnel should plan or implement the installation, start-up, operation and
maintenance of this equipment. Personnel must read the entire SSW07 User’s Guide before attempting to install, operate
or troubleshoot the SSW07.
Figure 1 - Power and Grounding Connections
Basic Wiring:
1. Mount the SSW07 to a flat vertical surface.
2. Connect the three-phase incoming power leads to the R, S, and T connections on the power terminal (refer to
Figure 1). Connect the motor leads to the U, V, and W connections on the power terminal and connect the
GROUND lead to PE on the chassis (refer to Figure 1). Note: Only three-phase AC motors can be used.
3. Connect the control power line (L) and neutral (N) leads to the A1 and A2 connectors (refer to Figure 1).
Control Power
L
N

Related product manuals