WEEKLY CHECKLIST
(or after 48 hours of continuous operation)
MON.
TUES.
WEDS.
THURS.
FRI.
WEIGH BUCKETS (THE MACHINE MUST BE POWERED WHEN PERFORMING THIS STEP)
Calibrate all of the Weigh Bucket
Load Cells using the H.M.I.
ENSURE THAT THE MACHINE HAS BEEN TURNED OFF, LOCKED OUT / TAGGED OUT BEFORE PERFORMING
MAINTENANCE ON PARTS. SOME CALIBRATIONS REQUIRE THE MACHINE TO BE POWERED, USE ALL DUE CAUTION
WHEN CALIBRATING THE MACHINE WHILE IT IS POWERED.
1
ST
WEEK
2
ND
WEEK
3
RD
WEEK
4
TH
WEEK
CENTER CONE LOAD CELL
Calibrate the Center Cone Load
Cell (If the Center Cone is
equipped with a Load Cell.)
VIBRATORS
Inspect all rubber seals on Linear
and Center Cone vibrators for
tears and holes, replace if needed.
Check the tension on serpentine
springs of the Vibrators. If
necessary, adjust tension.
PC PANEL
Properly shut down and reboot the
PC panel. (see PC Panel Shut
Down Procedure on page 96)
ELECTRONICS
Ensure all connections to the PC
panel are firmly secured.
ELECTRONICS
Check the interior of the Control
Box and clean all electrical
contacts
PNEUMATICS (IF EQUIPPED)
Test if the Filter Regulator is
functioning properly and check for
air leaks in the machine. Ensure
air lines are free of moisture.