EasyManua.ls Logo

Weishaupt WRS - Equipment Assignment and Customer Handover

Weishaupt WRS
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34
9
9.2 Equipment and assignment
9.3 Hand-over to the customer
Your customer service
The customer was informed about the operation of the
system and all documents have been handed over ❑
Date _____________________________
Signature
Heating engineer _____________________________
To be completed by the heating engineer Access via
central operating
Assignment (e.g. ground floor) unit to:
Base module CPU-B1 for heat circuit 1
❑ __________________ ❑
CPU-B2 for heat circuit 1 ❑
CPU-B3 for heat circuit 1 ❑
Extension module EM#2 for heat circuit 2 ❑ __________________ ❑
EM#3 for heat circuit 3 ❑ __________________ ❑
EM#4 for heat circuit 4 ❑ __________________ ❑
EM#5 for heat circuit 5 ❑ __________________ ❑
EM#6 for heat circuit 6 ❑ __________________ ❑
EM#7 for heat circuit 7 ❑ __________________ ❑
EM#8 for heat circuit 8 ❑ __________________ ❑
EM#9 for heat circuit 9 ❑ __________________ ❑
Room influence active ❑ Reference room:
not active ❑ _________________________
External available ❑
temperature sensor
not available ❑
Separate D H W active ❑
program
not active
❑
(i.e. D H W loading
release with pre-set
designation to the selected
heating program)