EasyManua.ls Logo

Williamson Series 2 - Page 28

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
Part Number 550-142-785/0812
GWI
Series 2 Gas-Fired Water Boilers – Boiler Manual
11 Service and maintenance continued
Theboilercontainsceramicberandberglassmaterials.Usecarewhenhandlingthesematerialsperinstructionson
page 48ofthismanual.Failuretocomplycouldresultinseverepersonalinjury.
Inspect Inspect
Reported problems
Inspect anyproblems reported by owner and correct before
proceeding.
Boiler area
1. Verifythat boilerareais freeofanycombustiblematerials,
gasolineandotherammablevaporsandliquids.
2. Verifythat boiler area (and air intake)isfree of anyofthe
contaminants listed in Table 2 on page 5ofthismanual.Ifany
ofthesearepresentintheboilerintakeairvicinity,theymust
beremoved.Iftheycannotberemoved,installcombustionair
piping to the boiler in accordance with national, provincial or
local codes.
Air openings
1. Verify that combustion and ventilationair openings to the
boilerroomand/orbuildingareopenandunobstructed.Check
operationandwiringofautomaticcombustionairdampers,if
used.
2. Verifythatboilerventdischargeandairintakearecleanand
freeofobstructions.
Flue gas vent system
1. Visuallyinspectentireuegasventingsystemforblockage,
deteriorationorleakage.Repairanyjointsthatshowsignsof
leakageinaccordancewithventmanufacturer’sinstructions.
2. Verifythatmasonrychimneysarelined,liningisingoodcondi-
tion, and there are not openings into the chimney.
Failuretoinspectfortheaboveconditionsandhave
them repaired can result in severe personal injury
or death.
Pilot and main burner flames
1. Visually inspect pilot burner and main burner flames as di-
rected under Section 7, page 20ofthismanual.
Water piping
1. Checktheboilerinteriorpipingandallsystempipingforsigns
ofleaks.
2. Repairanyleaksbeforeproceeding.
Electricalshockhazard—Turnoffpowertotheboiler
beforeanyserviceoperationontheboilerexceptas
noted otherwise in this instruction manual. Failure
toturnoffelectricalpowercouldresultinelectrical
shock,causingseverepersonalinjuryordeath.
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Severe damage to
boiler will occur, resulting in substantial property
damage.
Eliminateallsystemorboilerleaks.Continualfresh
makeupwaterwillreduceboilerlife.Mineralscan
buildupinsections,reducingheat transfer,over-
heatingcastiron,andcausingsectionfailure.Leak-
ing water may also cause severe property damage.
Boiler heating surfaces
1. Disconnect the vent pipe at the boiler inducer outlet connection
afterturningoffpowertotheboiler.
2. Useabrightlighttoinspecttheuepipeinteriorandinducer
interior.
3. Inspect theboilerventoutlet areaandheating surfacesby
lookingthroughtheopening.
4. Iftheventpipeorinducerinteriorshowevidenceofsoot,fol-
low“Cleaningboilerheatingsurfaces”,page 27, to remove
theuecollectorandcleantheboilerifnecessaryafterclose
inspectionofboilerheatingsurfaces.Ifthereisevidenceof
rustyscaledeposits,checkthewaterpipingandcontrolsystem
tomakesuretheboilerreturnwatertemperatureisproperly
maintained(perthismanual).
5. Reconnectventtoinduceroutlet(sealjointperpage 8)and
replaceallboilercomponentsbeforereturningtoservice.
6. Checkinsideandaroundboilerforevidenceofanyleaksfrom
theboiler.Iffound,locatesourceofleaksandrepair.
Burners and base
1. Afterturningoffpowertotheboiler,removethejacketdoor
andbaseaccesspanel(Figure 21, item 4, page 42).
2. Inspectburnersandallothercomponentsintheboilerbase.
3. Ifburnersmustbecleaned,raiserearofeachburnertorelease
fromsupportslot,slideforwardandremove.Thenbrushand
vacuumtheburnersthoroughly,makingsureallportsarefree
ofdebris.Carefullyreplaceallburners,makingsureburner
with pilot bracket is replaced in its originalposition and all
burnersareupright(portsup).
4. Inspectthebaseinsulation.
a. Verifythattheinsulationisintactandsecureagainstall
foursidesofthebase.
Ifinsulationisdamagedordisplaced,donotoper-
ate the boiler. Replace or reposition insulation as
necessary. Failure to replace damaged insulation
can result in a fire hazard, causing severe personal
injury, death or substantial property damage.
Condensate drain system
1. Ifventsystemisequippedwithacondensatedrain,checkthe
hoseandconnectionsfortightness.
2. Verifythehoseisunobstructedandingoodconditionandthat
condensatecanowfreely.Replacehoseifnecessary.