30
Part Number 550-142-785/0812
GWI
Series 2 Gas-Fired Water Boilers – Boiler Manual
❏ Check/test ❏ Review with owner
1. ReviewtheUser’sInformationManualwiththeowner.
2. Emphasizetheneedtoperformthemaintenanceschedule
speciedintheUser’sInformationManual(andinthismanual
aswell).
3. Remindtheowneroftheneedtocallinalicensedcontractor
shouldtheboilerorsystemexhibitanyunusualbehavior.
4. Remindtheownertofollowthepropershutdownprocedure
andtoscheduleanannualstart-upatthebeginningofthe
nextheatingseason.
1. Shut down boiler:
• Follow“ToTurnOffGastoAppliance”instructionsonboiler
and“Operatinginstructions”.
• Donotdrainboilerunlessitwillbeexposedtofreezing
temperatures.Ifusingantifreezeinsystem,donotdrain.
2. Follow shutdown procedure.
3. Remove venting system connection to boiler.
4. Removetopjacketpanel.Turnbackinsulation.
5. Removecollectorbox/transitionassembly.Cleansealantfrom
assembly and sections.
6. Remove radiation plates hanging between sections.
7. Removeburners from base. Brush and vacuumburners to
removealldustandlint.Verifythatallburnerportsarefreeof
debris.
8. Placenewspapersinbaseofboilertocollectsoot.
9. Cleanbetweensectionswithwireuebrush.
10. Remove newspaper and soot. Vacuum or brush base and
surrounding area.
11. Reinstall radiation plates.
12.Replacecollectorbox/transitionassembly.Sealwithsealant.
Obtain gas-tight seal to prevent flue gas spillage and carbon
monoxide emissions,resulting in severepersonal injury or
death.
13.Replaceinsulationandjackettoppanel.
14.Startupboilerfollowingpages 18 –20ofthismanualandthe
boiler“Operating Instructions”. Excessive sooting indicates
impropergascombustion.Iffoundcheckforpropercombus-
tionandmakeanynecessaryadjustments.
❏ Cleaning boiler heating surfaces
Boiler relief valve
1. Inspectthereliefvalveandliftthelevertoverifyowasinthe
following warnings, excerpted from a relief valve manufac-
turer’swarninglabel.Beforeoperatinganyreliefvalve,ensure
thatitispipedwithitsdischargeinasafeareatoavoidsevere
scald potential. Read manual Section 4, page 13, before
proceedingfurther.
SafetyreliefvalvesshouldbereinspectedATLEAST
ONCE EVERYTHREEYEARS, by a licensed
plumbing contractor or authorized inspection
agency, to ensure that the product has not been
affected bycorrosivewater conditions and to
ensure that the valve and discharge line have not
been altered or tampered with illegally. Certain
naturally occurring conditions may corrode the valve
or its components over time, rendering the valve
inoperative. Such conditions are not detectable
unless the valve and its components are physically
removed and inspected. This inspection must
only be conducted by a plumbing contractor or
authorized inspection agency — not by the owner.
Failuretoreinspecttheboilerreliefvalveasdirected
couldresultinunsafepressurebuildup,whichcan
result in severe personal injury, death or substantial
property damage.
2. Afterfollowingtheabovewarningdirections,ifthereliefvalve
weepsorwillnotseatproperly,replacethereliefvalve.Ensure
thatthereasonforreliefvalveweepingisthevalveandnot
over-pressurization of the system due to expansion tank
waterlogging or undersizing.
Following installation, the valve lever must be op-
erated AT LEAST ONCE AYEAR to ensure that
waterwaysare clear. Certain naturally occurring
mineral deposits may adhere to the valve, rendering
it inoperative. When manually operating the lever,
waterwilldischargeandprecautionsmustbetaken
to avoid contact with hot water and to avoid water
damage.Beforeoperatinglever,checktoseethat
a discharge line is connected to this valve direct-
ingtheowofhotwaterfromthevalvetoaproper
placeofdisposalotherwiseseverepersonalinjury
mayresult.Ifnowaterows,valveisinoperative.
Shutdownboileruntilanewreliefvalvehasbeen
installed.
The boiler contains ceramic fiber and fiberglass
materials.Usecarewhenhandlingthesematerials
per instructions on page 48ofthismanual.Failure
to comply could result in severe personal injury.
11 Service and maintenance continued