EasyManua.ls Logo

Windhager VarioWIN - Opening the Cladding Door; Check before Switching on

Windhager VarioWIN
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
Operation
2.4 Check before initial start-up
a) System pressure (heating water pressure):
The system must be filled and vented. With the system cold, pressure should be at least 1.0 bar (maximum
1.8 bar) – Fig. 7. If you have any questions, your installer will gladly answer them.
Pressure gauge (system pressure)
Fig. 7 Filling the system
b) Ventilation:
If you are operating the device with room air, please make sure the room where it is installed is well venti-
lated. The air supply must be as free of dust as possible.
c) Flue:
Please have the chimney sweep check the flue, and, if necessary, clean it.
Filling and evacuation cock
2.3 Opening the cladding door
Fig. 6 Opening the cladding door with the key.
Warning of hot surface: risk of burns!
Before touching the combustion chamber and ash door handles, you must switch off the boiler and let
it cool.
Insert the key, turn a quarter turn to the left and open the cladding door – Fig. 6.

Table of Contents

Other manuals for Windhager VarioWIN

Related product manuals