Trailer Installation
Up/Down & Feed Handle Relocation
1
1-4 1510doc111714 Trailer Installation
1.3 Up/Down & Feed Handle Relocation
Because the sawmill sits higher when mounted to the optional trailer, parts are included
that allow you to relocate the up/down and feed crank handles to a lower position.
1. Move the saw head to rear of the sawmill and lower all the way down. Lower the saw
head until it rests on the bed to provide slack in the up/down chain.
2. Loosen the up/down chain lower sprocket mounting bolt and the chain tension bolt.
3. Disassemble the up/down chain master links from the mounting bracket and remove the
chain from the sawmill.
See Figure 1-4.
FIG. 1-4
150193-4
Loosen mounting
& tensioner bolts
Remove bottom
sprocket cover
Disassemble chain
from mounting bracket