EasyManua.ls Logo

Wood-mizer LT15 - Trailer Installation; Pre-Assembled Sawmill

Wood-mizer LT15
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Trailer Installation
Pre-Assembled Sawmill
Trailer Installation 1510doc111714 1-1
1
SECTION 1 TRAILER INSTALLATION
IMPORTANT! The trailer option is intended for use with LT15 sawmills Rev. E4.00
(LT15BS bed section Rev. E.00) and newer with three bed sections. LT15 sawmills prior
to Rev. E6.08 require modification to the mast to allow repositioning of the up/down sys-
tem (See Section 1.3
).
1.1 Pre-Assembled Sawmill
If you are adding the LT15TRG trailer option to an assembled LT15 sawmill, the assem-
bled sawmill bed can be lifted onto the trailer frame. Be sure to use adequate manpower
and lifting equipment to safely lift and stabilize the sawmill during installation.
1. Disassemble the feed rope from the rear rope bracket and remove from the feed crank
pulley. Remove the rear feed rope bracket from the sawmill. Move the saw head to the
rear end of the bed and support with lifting equipment such as a forklift or hoist. Remove
the saw head from the bed and set aside.
2. Using adequate lifting equipment, lift the sawmill bed off the ground. Remove the legs.
See Figure 1-1.
3. Position the trailer next to the sawmill, oriented so the front of the sawmill is at the hitch
FIG. 1-1
Remove
legs from
sawmill
Disconnect feed rope,
remove bracket and
remove saw carriage
150193-1

Other manuals for Wood-mizer LT15

Related product manuals