EasyManua.ls Logo

Worcester 34CDi GC 47-406-36

Worcester 34CDi GC 47-406-36
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
UK/IE
INSTALLATION COMMISSIONING AND SERVICING INSTRUCTIONS
WALL HUNG RSF GAS FIRED CONDENSING COMBINATION BOILER
GREENSTAR CDi CLASSIC
FOR SEALED CENTRAL HEATING SYSTEMS AND MAINS FED DOMESTIC HOT WATER
6 720 803 599 (2012/06)
The appliances are for use with:
Natural Gas or L.P.G. (Cat. II type C13, C33)
Natural Gas: 29CDi GC number 47-406-34
34CDi GC number 47-406-36
38CDi GC number 47-406-38
42CDi GC number 47-406-10
L.P.G.: 29CDi GC number 47-406-35
34CDi GC number 47-406-37
38CDi GC number 47-406-39
42CDi GC number 47-406-11

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Worcester 34CDi GC 47-406-36 and is the answer not in the manual?

Worcester 34CDi GC 47-406-36 Specifications

General IconGeneral
Model34CDi
GC Number47-406-36
CategoryBoiler
Boiler TypeCombi
Efficiency90%
Gas TypeNatural Gas
Dimensions (H x W x D)760 x 440 x 360 mm
Central Heating Flow Temperature Range30°C - 80°C

Summary

1 Key to Symbols

1.2 Safety Precautions

Safety precautions and warnings for handling the boiler and its components.

2 Appliance Information

2.1 General Information

Details the standard package contents and identifies key components included with the boiler.

2.2 Layout & Components

Illustrates and labels the various internal components of the boiler.

2.3 Technical Data

Presents detailed technical specifications, performance data, and dimensions of the appliance.

3 Pre-Installation

3.1 Cleaning Primary Systems

Guidance on cleaning the existing central heating system prior to boiler installation.

3.2 Mains Supply

Details electrical, gas, and water supply requirements, including safety and pressure specifications.

3.3 Water Systems and Pipe Work

Covers requirements for plastic pipe work, primary system connections, and system fill procedures.

3.4 Condensate Pipe Work

Details condensate drainage requirements, including internal and external connections.

3.5 Pressure Relief Pipe Work

Details the installation requirements for the pressure relief valve discharge pipe.

3.6 Boiler Location & Clearances

Specifies minimum clearances required around the boiler for installation and servicing.

3.7 Plumbing Manifold

Details connections for the plumbing manifold, including pipe sizes for various services.

3.8 Flue Options

Lists available flue options and their maximum permissible lengths for different boiler models.

3.9 Flue Terminal Positions

Specifies minimum clearances for flue terminal positions to avoid combustion products entering the building.

3.10 Plume Management Terminal Positions

Details positioning for plume management terminal options to redirect flue discharge.

4 Installation

4.1 Unpacking Wall Frame and Ancillary Items

Provides instructions and safety precautions for unpacking the wall frame and ancillary items.

4.2 Wall Mounting Plate Flue Opening

Details the process of fixing the wall mounting plate and creating the flue opening.

4.3 Charging Link (Filling Loop)

Instructions for fitting the charging link (filling loop) for system filling and pressurisation.

4.4 Unpacking the Appliance

Step-by-step guide for removing the outer case of the boiler after unpacking.

4.5 Fitting the ApplianceBoiler Connections

Guides the connection of system pipes to the boiler and pre-plumbing manifold.

4.6 Flue Installation

Details various flue installation options, including telescopic kits and plume management.

4.7 Condensate Connection

Guidance on connecting the condensate drain pipework, ensuring correct fall and insulation.

4.8 Electrical

Details the electrical connections for mains supply, room thermostats, and frost thermostats.

4.9 Position of Wired Components

Diagram showing the location of wired components and internal wiring connections.

5 Commissioning

5.1 Pre-Commissioning Checks

Essential checks to be performed before commencing the commissioning process.

5.2 Filling the System

Step-by-step guide for filling the central heating system and pressurising it.

5.3 Starting the Appliance

Instructions for the initial start-up of the appliance, including system venting.

5.4 Water Treatment

Guidance on system flushing, adding inhibitor, and water quality requirements.

5.5 Commissioning

Procedures for checking gas inlet pressure, gas rate, and hot water functions.

5.6 Finishing Commissioning

Final steps for commissioning, including refitting the casing and handover to the customer.

6 Servicing and Spares

6.1 Inspection and Service

Procedures for inspecting the appliance and performing routine servicing tasks.

6.2 Setting the AirGas Ratio

Procedure for setting the air/gas ratio, requiring specialist equipment and competence.

6.3 Replacement of Parts

General guidance and safety precautions for replacing components within the boiler.

6.4 Short Parts List

A list of common spare parts with part numbers and GC numbers for easy identification.

7 Fault Finding & Diagnosis

7.1 Fault Finding

Information on identifying and resolving common faults using display codes and fault finding procedures.

7.2 Central Heating Function

Diagram illustrating the sequence of operation for the central heating function.

7.3 Preheat and DHW Function

Flowchart detailing the operation sequence for domestic hot water and preheat functions.

7.4 Protection Function

Explanation of the boiler's protection functions, including frost protection.

Related product manuals