ZC702 and ZVIK Getting Started Guide www.xilinx.com 23
UG926 (v6.0) December 17, 2013
Run the BIST Application
TIP: If any of the BIST tests fail, check the settings of the switches and jumpers as shown in Figure 1-4,
Table 1-1, and Table 1-2. If these settings are correct and the test still fails, please contact Xilinx
Support to review your Support options.