Table 2. Maintenance Schedule (See Figure 10) (Continued)
Item
No.
Item 8 Hr/
1 day
5
350 Hr/
2 month
5
2000 Hr/
1 year
5
Procedure or
Quantity
Specification
1
ISO VG 46 or equivalent.
2
Exxon Univis HVI 26 or equivalent.
3
For freezer or cold storage operation, MIL-G-7711A.
4
With rated load.
5
Whichever comes first.
6
Hydraulic oil changed at initial 350 hour interval.
7
Equalization Charge approximately each month but not more than each week.
8
Multipurpose Grease with 2-4% Molybdenum Disulfate for normal operations.
X=Check C=Change L=Lubricate
NOTE: Never use steam to clean electrical parts.
Maintenance Schedule
52