PRE-DELIVERY INSPECTION REPORT
10-4
C. ELECTRICAL
a. Ignition Switch Operation
b. Left Hand Switch Operation & Pass Beam
• Horn
• Indicator
• Head Light
c. All Bulbs - Functioning
d. Battery
• Electrolyte Level
• Specific Gravity
• Routing of Breather Pipe
• Fuse
• Routing of Positive Wire (Red) Below Breather Pipe
e. Starter Switch/Kill Switch
D. ROAD TEST
a. Starting
b. Gear Shifting Operation
c. Clutch Operation
d. Application of Brakes (Front and Rear)
e. Speedo/ Odo Meter Operation
f. Fuel Meter Operation
MAIN SELLING DLR'S STAMP, SIGN & CODE
EXPLAINED BY
SIGNATURE : NAME :
CUSTOMER’S SIGN.
SERVICE2.PMD 8/28/2006, 2:23 PM4