– 12 –
10. Air Funnel Set B (MGC-021008-20)
Installation
1. Installing the Primary Funnels
Screw on the Primary funnels on the throttle body. Put only the 4 lower screws like on the
photo. Use the short screws (30 mm).
2. Installing the Supports
Install the supports onto the levers.
Don’t forget to put the plastic rings (From STD) into the holes.
Parts List
No. PART No. PART NAMEQ’TY REMARKS
1 SUPPORT L 1
2SUPPORT R 1
3 UPPER LEVER1
4 UNDER LEVER1
5 PRIMARY FUNNEL L 1
6 PRIMARY FUNNEL R 1
7SECONDARY FUNNEL1
8BOLT 4