<8. Maintenance>
8-6
IM 01C25B01-01E
F0804.ai
Transmitter section
Pressure-detector section
Cover flange
Capsule gasket
Flange bolt
Setscrew
Nut
Figure 8.4 Removing and Mounting the Pressure-
detector Section
IMPORTANT
If you remove the vent/drain plugs when
disassembling EJ130 and EJ440
transmitters, install the plugs again before
reassemblingthecoverangeswiththecapsule
assmbly.
8.4.4 Replacing the Process Connector
Gaskets
This subsection describes process connector
gasketreplacement.(Seegure8.5.)
(a) Loosen the two bolts, and remove the process
connectors.
(b) Replace the process connector gaskets.
(c) Remount the process connectors. Tighten the
bolts securely and uniformly to a torque shown
below, and verify that there are no pressure
leaks.
Model
EJ110
EJ120
EJ130
EJ310
EJ430
EJ440
C capsule D capsule
Torque(N·m)
{kgf·m}
39 to 49
{4 to 5}
49 to 59
{5 to 6}
F0805.ai
Bolt
Process connector
Process connector gasket
Figure 8.5 Removing and Mounting the Process
Connector
8.5 Troubleshooting
If any abnormality appears in the measured values,
usethetroubleshootingowchartbelowtoisolate
and remedy the problem. Since some problems
havecomplexcauses,theseowchartsmay
notidentifyall.Ifyouhavedicultyisolatingor
correcting a problem, contact Yokogawa service
personnel.
8.5.1 Basic Troubleshooting
First determine whether the process variable
is actually abnormal or a problem exists in the
measurement system.
If the problem is in the measurement system,
isolate the problem and decide what corrective
action to take.
This transmitter is equipped with a self-diagnostic
function which will be useful in troubleshooting,
and the transmitter equipped with an integral
indicator will show an alarm code as a result of self-
diagnosis.
See subsection 8.5.3 for the list of alarms.
See also each communication manual.