Commissioning
50 / 54
IM01U10A00-00EN-R, 2nd edition, 2017-08-29
8 Commissioning
1. Activate external power switch.
2. Perform check of piping installation.
3. Check flow meter for device errors, warnings or alarms,
see chapter on Troubleshooting [}51].
4. Configure the transmitter, see chapter default settings at User´s Manual.
ð Flow meter is ready for operation.