EasyManua.ls Logo

Zip HydroTap G4 - Section 2 - Ventilation; Details

Zip HydroTap G4
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 10 of 16 801525 v3.05 09.20 HT C Com Install Instructions
Section 2
Ventilation
2.1 All Models
IMPORTANT: Proper air circulation must be provided. Allow a clearance envelope of 50mm either
side, and 200mm above the Command Centre. The system will operate correctly only if the recom-
mended clearances are provided.
It is recommended to install vent duct and louvre panels for under floor and /or door vent systems.
**Note: Inlet and outlet vents should be separated by a minimum of 100mm, to avoid hot air recirculation.
When installing air flow ducts, the following tools will be required:
Jigsaw and 12mm drill.
Keyhole or Wall Board saw.
Recommended Installation showing the correct air flow
**MIN. 100mm
Warm Air OUT
via kickboard louvre
MIN. 50mm
Cool Air IN via
cabinet floor,
front vent grille
!

Other manuals for Zip HydroTap G4

Related product manuals