EasyManua.ls Logo

Zodiac FloPro e3 - Hydraulic Connections

Zodiac FloPro e3
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
2.2 I Hydraulic connec ons
Respect the direc on of hydraulic connec on (see § “1.3 I Dimensions and marking”).
Choose the dimension of the pipes according to the size of the pool and respec ng the hydraulic rules which apply in
the country of installa on.
Performance curves are available in § “1.4 I Performance curves” for the pipe dimensions.
For hydraulic connec ons, use the Ø63/50 mm union couplings via bonding (provided) or the 2’’ threaded PVC
couplings directly screwed onto the pump.
Fit a check valve if the fi lter is installed above the water level.
Fit suc on and discharge isola on valves if the pump is installed below the water level.
To help prevent diffi culty in priming, install the suc on pipe without high points, which can trap air.
Check that the hydraulic correc ons are correctly  ghtened and that there are no leaks.
The pipes must be supported to prevent any risk of breakage due to the weight of the water.
: pump
: fi lter
: hea ng system
: water treatment system
Use as few elbow joints as possible. If there needs to be more than 10 elbow joints on the hydraulic circuit, increase
the pipe diameter.
Suc on pipe length = 4 x Ø
Suc on pipe too short
Risk of cavita on
Air reten on
Risk of incorrect pre- fi lter fi lling

Other manuals for Zodiac FloPro e3

Related product manuals