NetNumen™U31R06HardwareInstallationGuide
12.2CheckingtheAssembliesintheCabinets
Thisproceduredescribeshowtoverifythattheassemblyinstallationinthecabinets
complieswiththerelateddesignlesandrelatedstandards.
Prerequisite
lAcrossheadscrewdriverisready.
lTheCoreNetworkProductHardwareInstallationQualityStandardisready.
Steps
1.Verifythattheassembliesinthecabinetsareinstalledinaproperpositionin
accordancewiththedesignrequirements.
2.Verifythatallfasteningscrewsoftheassembliesaretightenedproperly,andtheboard
extractorsarelockedinposition.
3.Verifythatthesurfacesoftheassembliesarefreeofdirt.
4.Verifythatalllabelsareproperlyattached.
5.Verifythatblankpanelsareinstalledintheemptyslots.
6.Verifythattheairinletsandairoutletsofthefansarenotblocked,andthefanmodules
arepresent.
Caution!
Thefanmoduleshavebeeninstalledinashelfwhentheshelfisdelivered.Itisnot
allowedtoremovethefanmodulestopreventhardwaredamage.
–EndofSteps–
12.3CheckingthePowerCablesandGroundingCables
Thisproceduredescribeshowtoverifythattheinstallationofpowercablesandgrounding
cablescomplieswiththerelateddesignlesandrelatedstandards.
Prerequisite
lAcrossheadscrewdriverisready.
lTheCoreNetworkProductHardwareInstallationQualityStandardisready.
Steps
1.Verifythatthepowerdevices(suchaspowerdistributionboxes)areinstalledina
properpositioninaccordancewiththedesignrequirements.
2.Verifythatthepowercablesandgroundingcablesareproperlyinstalled.
12-2
SJ-20141121113158-006|2014-12-20(R1.0)ZTEProprietaryandCondential