Chapter5CabinetInstallation
Note:
Ensurethattheengineeringoverthecabinet(suchascabletrayinstallation)iscompleted,
sothatdustormetalscrapswillnotdropintothecabinetfromthetopduringthecabinet
installationprocess.
Prerequisite
lTherelateddesigndocumentsareready.
lThedrillingtemplate(providedwiththecabinet)isready.
lTheadjustablebases,AN01socketboltsareready.
lInstrumentssuchascrossheadscrewdriver,tapemeasure,anglesquare,spiritlevel,
powdermarker,markerpen,percussiondrill,vacuumcleaner,adjustablespanner,
torquespanner,socketspanner,clawhammer,punch,multimeter,andladderare
ready.
lSpacershims,insulatinggaskets,M12×90bolts(anM12×90boltcontainsaspring
washer,agasket,andaninsulatingwasher),M12×35bolts(anM12×35boltcontains
aspringwasherandagasket)areready.
Context
Fortheinstallationpositionofthecabinetintheequipmentroom,seeFigure5-3.
5-3
SJ-20141121113158-006|2014-12-20(R1.0)ZTEProprietaryandCondential