EasyManua.ls Logo

3M 3M-Matic 7000r - Installation; Operating Conditions; Space Requirements for Machine Operation and Maintenance; Tool Kit Supplied with the Machine

3M 3M-Matic 7000r
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
7-INSTALLATION
Figure 7-1
2014 June
7000r-7000r3 Pro - NA
To reduce the risk associated with
muscle strain:
Use the appropriate rigging and material
handling equipment when lifting or
repositioning this equipment.
Use proper body mechanics when
removing or installing taping heads that are
moderately heavy or may be considered
awkward to lift.
Figure 7-2
A tool kit containing some tools are supplied
with the machine. These tools should be
adequate to set-up the machine, however,
other tools supplied by the customer will be
required for machine maintenance.
7.3 Tool Kit Supplied with the Machine
7.1 Operating Conditions
The machine should operate in a dry and relatively
clean environment (See Speci cations).
7.2 Space Requirements for Machine Operation
and Maintenance Work
Minimum distance from wall (Figure 7-1):
A = 1000mm.
B = 700mm.
Minimum height = 2700mm.
WARNING
B
A
7.4 Machine Set-Up / Bed Height
1 - Lift the machine with belts or ropes paying attention
to place the belts in the points (Figure 7-2).
To set the machine bed height, do the following:
2 - Adjust machine bed
height. The case
sealer is equipped
with four (4) adjust-
able legs that are
located at the cor-
ners of the machine
frame.
The legs can be
adjusted to obtain
different machine
bed heights
(Figure 7-3).
Also refer to the
"Speci cations"
section.
3 - Lock the screws.
4 - Repeat the
operation for all legs.
(It is not necessary
to x or anchor the
machine to the oor).
5 - For Outer Column Repositioning -
See Special Set-up Procedure (Section 13).
Figure 7-3

Table of Contents

Related product manuals