4B - W4005 BÜHLER ELEVATOR MONITORING SYSTEM R9.6 – 22 May 2020
Page 42 of 48
15. Commissioning
DANGER: EXPOSED BUCKETS AND MOVING PARTS WILL CAUSE SERIOUS INJURY OR
DEATH. THE OPERATOR MUST ALWAYS LOCKOUT POWER BEFORE REMOVING COVER OF
THE INSPECTION DOOR OF THE ELEVATOR OR PERFORMING ANY INSTALLATION OR
MAINTENANCE WORK.
DANGER: ALL ELECTRICAL POWER TO THE SYSTEM AND WIRING MUST BE ISOLATED PRIOR
TO STARTING ANY INSTALLATION OR MAINTENANCE WORK. WORKING ON OPEN LIVE
CIRCUITS IN ATEX ZONES IS PROHIBITED AND CAN LEAD TO AN EXPLOSION.
1) Please follow steps 1 to 7 of the 14 - Maintenance Procedure section of this manual
2) Calibrate the W4005NV46AI /B controller as explained in section 10.14 - W4005NV46AI /B
Calibration
3) Perform the normal machine start / stop sequence as explained in section 10.17 - Normal Machine
Start / Stop
4) Perform the alarm shutdown sequence as explained in section 10.18 - Alarm Shutdown Restart of
this manual
16. System Breakdown Procedure
In the event of the W4005V46-SYSx /B system or any part of it not operating correctly, the machine must be
stopped immediately, and the system repaired or replaced. The system must then be re-commissioned and
verified to be working correctly. Please refer to 13 - Troubleshooting Guide for the details.
If the user decides to bypass the W400 system and operate without protection, the machinery is not
protected against explosion risks and the end user takes all the responsibility for this action.
17. Manufacturer Information
Table 29 - Manufacturer Information
17.20 Manufacturer Detailed Information
Don Electronic Ltd
Westfield Industrial Estate
Kirk Lane, Leeds
LS19 7LX
UK
Synatel Instrumentation Ltd.
Walsall Road, Norton Canes
Cannock, Staffordshire
WS11 9TB
UK