6.6 Draining the gas outlet casing
If there is a boiler leak into the exhaust gas pipe or an ingress of water due to other causes,
the gas outlet casing can be drained.
Figure 20: Drain pipe diagram
01 Drain pipe A Position 1
02 Drain cock B Position 2
03 Drain
04 Air line from compressor casing
On the drain pipe (01), set the drain cock (02) to position 1 (A).
If the drain pipe (01) is blocked:
Set the drain cock (02) to position 2 (B) and clean the drain pipe (01) with air from the
compressor casing (04).
If cleaning with air is not sufficient, the drain pipe (01) must be cleaned mechanically.