Additional requirements for cabinet installations
Make sure that the cooling air gratings of the drive will not be covered. Make sure
that the required cooling air flow is achieved. In a totally closed cabinet with no
forced ventilation, a fan for circulating the air inside the cabinet may be needed.
For UL installations, plan the wire bending radius of input power and motor cables
according to UL rules.
Necessary tools
To move a heavy drive, you need crane, fork-lift or pallet truck (check load capacity!).
To lift a heavy drive, you need a hoist.
To install the drive mechanically, you need the following tools:
drill with suitable bits
screwdriver set (Torx, flat and/or Phillips, as appropriate)
socket set (metric)
Moving the drive
Move the drive in its transport package to the installation site. Use a pallet truck
when you move a heavy drive package.
16 Mechanical installation General