EasyManua.ls Logo

ABB ACS580-01 +C135 Series - Page 28

ABB ACS580-01 +C135 Series
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Detach the power cable shelf (screws i). Reinstall the screws (1.5 N·m/1.1 lbf·ft)
to avoid moisture exchange through the empty holes! Attach the cable shelf
to the bottom bracket with M4 nuts. Frame R3 is shown as an example. The
cable shelf varies in different frame sizes.
î0QXW
1āP (1.1 lbf·ft)
1āP (1.1 lbf·ft)
L
L
28 Mechanical installation Frames R1 to R3

Table of Contents

Other manuals for ABB ACS580-01 +C135 Series

Related product manuals