Mechanical installation 43
Unpacking and examining the delivery (ACS880-01 frames
R3 to R5)
This illustration shows the layout of the transport package. Examine that all items are
present and there are no signs of damage. Read the data on the type designation
label of the drive to make sure that the drive is of the correct type.
Item Description Item Description
1 Cable box package 6 Straps
2Drive 7Pallet
3 Printed quick guides and manuals,
multilingual residual voltage warning
sticker and manuals CD inside the
box
8 Control panel selected in the order (in
a separate package) in the option box.
4 Cardboard box. Mounting template
in the cardboard box.
9 Possible options in separate
packages, if they have been ordered
with a plus code.
5 Stopper
To unpack:
Cut the straps (6).
Remove the cardboard box (4) and option box (3).
Remove the stopper (5).
Lift the drive.
5
4
1
2
3