EasyManua.ls Logo

ABB DCT880 - DCT880 Preventive Maintenance Checklist; Preventive maintenance checklist template; Environment checks checklist; Maintenance checklist (no voltage)

ABB DCT880
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
82
Preventive maintenance Checklist DCT880
Type:
Frame size:
Serial number:
Year of initial startup:
Last inspection:
Inspection
cycle
T1-T5
T6
T7
T8
1. Environment
1.1 Checking the environment
yearly
1.2 Documentation checked and available
yearly
1.3 Checking the spare parts
yearly
2. Maintenance with no voltage applied
2.1 Cleaning with ESD vacuum cleaner and / or soft brushes
Thyristor power controller and cabinet
yearly
Air inlet and outlet filters (replace / clean if IP54 or if needed)
yearly
Fins of fan
yearly
Heat sinks
yearly
2.2 Relays & connections
Inspect relays / contacts for proper functionality
3 years
Inspect electrical connections for tightness
3 years
Inspect for proper grounding
yearly
Inspect for corrosion
yearly
Inspect connection of flat cables
6 years
3. Maintenance with main supply voltage applied
Create parameter backup
yearly
Check level of all connected voltages
yearly
Inspect condition of fans (check that all fans are operational)
yearly
Preventive Maintenance
3ADW000449R0101 DCT880 Service Manual e a

Table of Contents

Related product manuals