7. Assembly & Commissioning
DANGER!
Before any activity, first check whether the
work can be performed without risk and
under the observance of the local valid
regulations. In case of any doubt, contact
your supervisors for clarification
IMPORTANT! DANGER!
We recommend that all work is carried out in
a dry environment and with good lighting
conditions
IMPORTANT! DANGER!
The component needs to be considered as
sensitive. Special precautionary measures must
be taken to protect against electrostatic
influences
The high-voltage circuit must be disconnected
The auxiliary voltage must be disconnected
during the work
Tighten all screws with the prescribed tightening
torques
After work has been completed, reclose the
casing (or for an interruption scheduled over a
longer period, also properly re-attach the
packaging), in order to prevent the penetration
of dust and moisture as well as the manipulation
by third parties
Ensure that, after each stage of work, loose
parts (cover, bolts, nuts etc...) are
safeguarded in an orderly fashion and are
not lost.
applied to the apparatus, in particular to the
sections are to be used, in order to avoid
excessive mechanical stresses.
voltage supply and the protection and process
the local conditions.
After mounting and connection of the apparatus,
elements (cover panel, doors etc.) must be
checked.
It must also be ensured that the manual hand
crank is kept accessible in a safe place.
7.2.2. Connecting Pole and Control Box
7.2.2.1. Version: External Multipin fast connector
“Umbilical Cord”. This shielded cable is
prefabricated and factory tested. This cable is
box. In this option, the fast connector must be
connected for installation to the bottom part of
the pole.
connector is secured by both handlevers to the
fixed part.
7.1. Unpacking the Material
During unpacking, ensure careful handling in
order to avoid possible damage. Then, dispose of
the relevant packaging materials to the recycling
circuit.
7.2. Assembly / Installation
7.2.1. General
This procedure is generally valid for one pole and
configuration and is available on request.
influences, a minimum of mechanical stress is