7.2.4. Control Box connection





corresponding indications.
The cable supply to the control box must be
designed with screened cables, screening
earthed at one side and separated cables
for signal and voltage supply.
The supply of the heating resistance should be
operated permanently regardless of the season
and climate, and only interrupted for maintenance

7.3. Commissioning
7.3.1. Status Check


 Perfect condition of the insulators
 
 
specifications for the supply voltage on the
rating plate and the installation or system
 Presence of the manual tripping crank
 Correctly performed earthing
 Apparatus has reached ambient temperature
(± 5 °C)
 The heating resistances of the control box and
pole are connected and in operation.
 
box
 

the drive unit and control box
Option: 

 


service” position
 
breaker for the control circuit, to the

7.3.2. Commissioning


 
READY indicator lamp lights up continuously

capacitors
 

 
button or by remote signals
 In both positions, check that the remote
signalling matches the mechanical local display
 



indications
 
and 
counter and note the value in the apparatus
logbook
 The apparatus is ready for remote control
operation
7.3.3. Function of the Ready Signal
As long as the LED indicator “Ready” is not
active or the signal contact “READY” is not
closed, the apparatus cannot be electrically
actuated.
The LED indicator “Ready” and the contact

 Controller (CPU) in standby, ready for operation
 

 Capacitor charge is sufficient to perform the

 Coil supervision
If all criteria are satisfied, the apparatus can be
operated. If one of the above criteria is not
fullfilled the apparatus goes into the “NOT READY”
state.
7.3.4. Control of the output power driver

to verify that they are not in a status that could


 
 Immediately after an opening operation
 Immediately before a closing operation
 Every 6 hours