2750 515-1 EN, REV. 14, 2020-06-26
Transformer bushing, type GOE 250 to 2550
Installation and commissioning guide

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the ABB GOE Series and is the answer not in the manual?

ABB GOE Series Specifications

General IconGeneral
BrandABB
ModelGOE Series
CategoryIndustrial Equipment
LanguageEnglish

Summary

Safety

Levels of Safety Risks

Explains the different levels of safety risks indicated in the manual.

Hazardous Working Situations

Lists hazardous working situations and required actions.

Safety Precautions

Details precautions for handling transformer oil and waste.

Competence Level

Specifies that installation must be performed by authorized personnel.

Product Description

Design Overview

Provides an overview of the GOE bushing and its general schematics.

General Specifications

Lists general technical specifications for the bushing.

Mechanical Loading

Details maximum permitted static load on the outer terminal.

Delivery

Incoming Inspection

Instructions for checking delivered items and inspecting for shipping damage.

Transportation

Guidelines for transporting the bushing in its box.

Storage

Recommendations for short and long-term storage of the bushing.

Lifting

Lifting the Transport Box

Procedure for lifting the transport box with soft lifting slings.

Lifting Bushing from Transport Box

Steps for carefully lifting the bushing from its transport box.

Installation

Tools

Lists required tools for installation with part numbers and notes.

Consumables

Lists necessary consumables like lubricants and thread-locking fluids.

Lifting the Bushing

Details on lifting the bushing using a lifting tool and slings.

Oil-filling for Horizontal Installation

Procedure for filling the bushing with oil before horizontal installation.

Horizontal Installation

Step-by-step guide for installing the bushing horizontally on the transformer.

Calculating Draw Lead Length

Method to calculate the correct draw lead length based on measurements.

Installing with Draw Lead

Detailed procedure for installing the bushing with a draw lead.

Installation with Draw Rod at Transformer Factory

Procedures for installing the draw rod system at the transformer factory.

Removing Lower Draw Rod Assembly

Procedure to remove the bottom contact and draw rod assembly.

Installing Small Bottom Contact

Steps for installing the small bottom contact onto the transformer.

Installing Large Bottom Contact

Steps for installing the large bottom contact onto the transformer.

Installing Bushing on Transformer (Factory)

Procedure for correctly installing the draw rod parts and mounting the bushing.

Installation with Draw Rod at Site

Procedures for installing the draw rod system at the installation site.

Site Preparations

Steps to prepare the transformer and bushing for installation at site.

Installing Bushing on Transformer (Site)

Detailed procedure for installing the bushing onto the transformer at the site.

Hydraulic Tightening of Draw-Rod Nut

Method for tightening the draw-rod nut using a hydraulic jack.

Manual Tightening of Draw-Rod Nut

Procedure for manually tightening the draw-rod nut with torque specifications.

Minimum Transformer Oil Level

Specifies the maximum allowed oil level from the bushing flange.

Outer Terminal Installation

Steps for preparing and installing the outer terminal onto the bushing.

Grounding Bushing Flange

Instructions for grounding the bushing flange to the transformer tank.

Commissioning

Waiting Time Before Energization

Specifies waiting times before energizing based on storage and oil-filling methods.

Tightness Test (Transformer-Bushing Flange)

Describes methods for testing the seal between transformer and bushing flange.

Tightness Test (Outer Terminal)

Procedure for testing the tightness of the bushing outer terminal.

Capacitance and Dissipation Factor Measurement

Details how to measure capacitance and dissipation factor for diagnostics.

Through-Resistance Measurement

Method for measuring the through-resistance of the bushing and connections.

Maintenance

Recommended Maintenance

States bushings are maintenance-free but covers cleaning and general safety.

Checking Oil Level

Procedure for checking and maintaining the correct oil level in the bushing.

Taking Oil Samples

Guidelines for taking oil samples, primarily for authorized personnel.

Re-packing

Removal of Bushing from Transformer

Steps for removing the bushing and draw rod from the transformer.

Removal of Horizontally Installed Bushings

Procedure for removing bushings installed in a horizontal orientation.

Re-packing the Bushing

Instructions for re-packing the bushing into its transport box.

Spare Parts and Special Tools

Spare Parts

Lists spare parts for the test tap, oil-plug, and covers.

Special Tools

Lists special tools like lifting tools and pull-through cords.

Disposal and Environmental Information

Disposal and Recycling

Information on how to dispose of worn-out equipment and its materials.

References

Appendix

Measurement Record

Template for recording draw rod measurements for future reference.