MNS DTR / MNS Service
109
Konserwacja i części zamienne
Maintena
n
ce
and Spare Parts
5
Frequency
Install. category
Item
no.
Work to be performed
Measured, test & limit values, operating & auxiliary mate-
rials
A
B
C
Remarks
Cable connection
Insulation molten or even corroded
Screwed connection at electrical equipment
For tightening torque, cf. manufacturer´s instructions
Insulation
Check controller module
Check controller settings
C/k value
In accordance with manufacturer´s operating instructions
cos setpoint
response time
Approximate value 60 s
Check step triggering
Power circuit open, i.e.
fused switch discon-
nector removed
2.3
Direct connection (incoming and outgoing feeders
with circuit breaker)
Analogous to item 1.3
Gen. inspection of
switchgear assembly
Additional checks:
Check main switching device
Visual inspection of main connections
1°
6m
X
Procedure in
Color change at switch main connections
accordance with
Condition of main and eroded contacts
manufacturer´s
Function test
1a
6m
X
instructions
Check current transformer arrangement
Fastening of transformers
Secondary cable routing
Condition of transformer housings
Check supports at angle and connection sets
Check screwed connections
Mechanical condition of supporting plate
1a
6m
X
Condition of partitioning (if available)
Formation of creepage paths
Check external connections
Check screwed connections
Check cable strain relief
Cable routing, min. bending radii, edge protection, etc.