About this guide
This guide contains the very basic information about the mechanical and electrical
installation and start-up of the NETA-21 remote monitoring tool.
Safety instructions
If you need to connect the remote monitoring tool to a control board inside the
drive/converter/inverter, follow the Safety instructions below.
WARNING! Ignoring the following instructions can cause physical injury or
death, or damage to the equipment.
Only qualified electricians are allowed to install and maintain the drive, converter
and/or inverter!
Disconnect the drive, converter or inverter to which the option module will be
installed or connected from all possible power sources. After disconnecting,
always wait for 5 minutes to let the intermediate circuit capacitors discharge
before you proceed.
Switch off all dangerous voltages connected to any control signal connectors in
reach. For example, 230 V AC may be connected from outside to a relay output of
the drive, inverter or converter.
Always ensure by measuring with a multimeter (impedance at least 1 Mohm) that
there are no parts under voltage in reach.

Other manuals for ABB NETA-21

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB NETA-21 and is the answer not in the manual?

ABB NETA-21 Specifications

General IconGeneral
BrandABB
ModelNETA-21
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals