15.2 Periodic maintenance
Component to be maintained Recommended cleaning interval Operating state
Gas piping At every disassembly Engine stopped
Table69: Maintenance interval
The following maintenance work must be carried out on the gas piping:
u If present: Remove insulation.
u Perform a visual inspection for cracks and deposits.
Always replace bellows with cracks with a new bellows.
Remove any deposits found on the bellows mechanically (using brushes).
u Perform a visual inspection of the sealing points (flange connection to the gas inlet cas-
ing and gas outlet casing).
Always replace bellows with damaged sealing locations with a new bellows.
Always replace dismantled gaskets with new gaskets.
Page 115 / 122

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Power2 340-H44 and is the answer not in the manual?

ABB Power2 340-H44 Specifications

General IconGeneral
BrandABB
ModelPower2 340-H44
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals