Figure 12: Block diagram of PowerWave 33 S3. On the left with single input feed configuration and on the right with dual
input feed configuration.
4.4 Wiring
Before proceeding to wire the UPS, make sure that you have read and understood the chapter above
4.2 Electrical installation and make sure that the following is respected:
• The cable sections and fuse ratings are respecting the local standards. Alternatively, you can
use the recommended cable sections and fuse rating in the tables 6 and 7, which are according
to (IEC 60950-1).
Table 5: SINGLE INPUT FEED (CABLE LINKS TO ACHIEVE SINGLE INPUT ARE OPTIONAL)
Rated
output
power
Cable E
(quantity x mm
2
)
60 kW
3x100 5x(1x35) 5x(1x35) 2x160 2x(1x50)
80 kW
3x125 5x(1x50) 5x(1x50) 2x200
2x(1x95) @ 42-45 batt. blocks
2x(1x70) @ 46-50 batt. blocks
100
kW
3x160 5x(1x70) 5x(1x70) 2x250
2x(1x120) or 2x(2x50) @ 42-45 batt.
blocks
2x(1x95) @ 46-50 batt. blocks
120
kW
3x200 5x(1x95) 5x(1x95) 2x300
2x(1x150) or 2x(2x50) @ 42-45 batt.
blocks
2x(1x120) or 2x(2x50) @ 46-50 batt.
blocks