| Rated Operational Current - Ie | 72 A |
|---|---|
| Degree of Protection | IP20 |
| Output current | Up to 72A |
| Rated Operational Voltage | 220-690V AC |
| Rated Operational Power - Motor (440V) | 45kW |
| Rated Operational Power - Motor (500V) | 45 kW |
| Rated Operational Power - Motor (690V) | 75kW |
| Initial Voltage During Start | 30-70% |
| Ramp Time | 1-30 seconds |
| Output Voltage at Start | Adjustable |
| Input voltage range | 220-690V AC |
| Output voltage | 220-690V AC |
| Operating temperature range | -25°C to +60°C |
Outlines the scope and purpose of the installation and commissioning manual.
Provides a concise guide for connecting, configuring, and starting the softstarter.
Guidelines and requirements for physically installing the softstarter.
Details the electrical connection procedures for the softstarter.
Specifics on connecting the main power lines to the softstarter.
Instructions for connecting control supply voltage and control circuits.
Comprehensive list of configurable parameters with their settings.
Guides through the basic configuration of frequently used parameters.
How to set the rated motor current parameter for the softstarter.
Configuration of the time taken for the softstarter to reach full voltage.
Configuration of the time taken for the softstarter to ramp down.
Function to limit the starting current by adjusting output voltage.
Configuration of motor overload protection classes and reset types.
Lists and explains various event codes and their causes.
Common issues encountered during startup and their solutions.
Details specific fault codes, their causes, and solutions.
Explains indications related to motor overload, underload, and locked rotor protection.
Electrical schematic for the fuse and contactor version.
Electrical schematic for the MCCB version.