9. Remove the known fault resistance attached earlier and apply a short circuit
instead.
10. In the ICT toolbar, select the Start reading from IED button.
11. When the stability criteria are fulfilled, select the Submit button once again.
ICT automatically shifts to the fourth calibration tab, Step4: Save calibration
factors. Here the newly calculated k1, k2 and reference 1 are presented.
12. Check in the Calibration result field that all tests have been passed.
12.1. If a failure is indicated during one or more check(s), follow the
instructions/tips provided by the ICT in the Calibration result field.
12.2. If these tips do not solve the issue, then contact ABB Support.
IEC11000221-1-en.vsd
IEC11000221 V1 EN
Figure 69: ICT calibration tab 4
13. Before proceeding any further make sure that you have removed the short-
circuit that was applied during calibration step 3.
14. To finish the calibration process, select the Submit to Parameter setting
button.
15. In Parameter setting, write the newly acquired parameters to IED.
Section 10 1MRK 502 029-UEN A
Calibrating injection based sensitive rotor earth fault protection
112
Installation and commissioning manual