6. Set the alarm time delay to the correct value according to the setting plan and
check the time delay, injecting a voltage corresponding to 1.2 · V/Hz>.
7. Connect a trip output contact to the timer and temporarily set the time delay
tMin to 0.5s.
8. Increase the voltage and note the V/Hz>> operate value
9. Reduce the voltage slowly and note the reset value.
10. Set the time delay to the correct value according to the setting plan and check
the time delay tMin, injecting a voltage corresponding to 1.2 · V/Hz>>.
11. Check that trip and alarm contacts operate according to the configuration logic.
12. Set the cooling time constant temporarily to min value (1min.) to quickly
lower the thermal content.
13. Wait for a period equal to 6 times Tcooling switch 20 minutes on a voltage
1.15 · V/Hz> and check the inverse operate time.
Wait until the thermal memory is emptied, set the cooling time constant
according to the setting plan and check another point on the inverse time
curve injecting a voltage 1.3 · V/Hz>.
14. Finally check that START and TRIP information is stored in the event menu.
15.7.4.2 Completing the test
Continue to test another function or end the test by changing the Test mode setting
to Off. Restore connections and settings to their original values, if they were
changed for testing purposes.
15.7.5 Voltage differential protection VDCPTOV
Prepare the IED for verification of settings as outlined in section
"Overview" and
section "Preparing for test" in this chapter.
15.7.5.1 Check of undervoltage levels
This test is relevant if the setting BlkDiffAtULow = Yes.
Check of
U1Low
Procedure
1. Connect voltages to the IED according to valid connection diagram and figure
97.
2. Apply voltage higher than the highest set value of UDTrip, U1Low and
U2Low to the U1 three-phase inputs and to one phase of the U2 inputs
according to figure
97.
The voltage differential START signal is set.
Section 15 1MRK 502 029-UEN A
Verifying settings by secondary injection
194
Installation and commissioning manual