EasyManua.ls Logo

ABB Relion 670 series - Central Account Management (CAM); Introduction to Central Account Management

ABB Relion 670 series
260 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.3.3.2 Mounting procedure for 19” panel rack mounting
xx08000160.vsd
1a
2
1b
IEC08000160 V1 EN
Figure 12: 19” panel rack mounting details
Pos
Description Quantity Type
1a, 1b Mounting angels, which can be mounted, either to
the left or right side of the case.
2 -
2 Screw 8 M4x6
Procedure
1. Carefully fasten the mounting angles (1a, 1b) to the sides of the IED.
Use the screws (2) supplied in the mounting kit.
2. Place the IED assembly in the 19” panel.
3. Fasten the mounting angles with appropriate screws.
1MRK 502 029-UEN A Section 5
Installing the IED
35
Installation and commissioning manual

Table of Contents

Other manuals for ABB Relion 670 series

Related product manuals