ABB Relion 670 series - Authorization with CAM-Enabled IED

ABB Relion 670 series
260 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
L1
(A)
L2
(B)
L3
(C)
Protected Object
CT 1200/1
Star/Wye
Connected
L1
(A)
L2
(B)
L3
(C)
CT 1200/1
Star/Wye
Connected
7
8
9
1
0
1
1
1
2
1
2
3
4
5
6
AI01
(I)
AI02
(I)
AI03
(I)
AI04
(I)
AI05
(I)
AI06
(I)
7
8
6
9
X1
R
4
R
5
R
6
1
2
1
2
1
2
11 12 13 14
U
U
U
R
1
1
3
4
2
1
3
R
2
2
4
1
3
R
3
2
4
1 2 3 4 5 6 7
L1 (A)
L2 (B)
L3 (C)
N
3-Ph Plate with Metrosils and Resistors
2
3
5
4
10
X X
L1 (A)
L2 (B)
L3 (C)
N
1
IED
IEC07000193_2_en.vsd
AI3P
AI1
AI2
AI3
AI4
AIN
SMAI2
BLOCK
^GRP2L1
^GRP2L2
^GRP2L3
^GRP2N
TYPE
IEC07000193 V2 EN
Figure 31: CT connections for high impedance differential protection
Pos
Description
1 Scheme earthing point
Note that it is of outmost importance to insure that only one earthing point
exist in such scheme.
2 Three-phase plate with setting resistors and metrosils.
3 Necessary connection for three-phase metrosil set. Shown connections are applicable for both
types of three-phase plate.
4 Position of optional test switch for secondary injection into the high impedance differential IED.
5 Necessary connection for setting resistors. Shown connections are applicable for both types of
three-phase plate.
6 The factory made star point on a three-phase setting resistor set.
Shall be removed for installations with 650 and 670 series IEDs. This star
point is required for RADHA schemes only.
7 How to connect three individual phase currents for high impedance scheme to three CT inputs
in the IED.
1MRK 502 029-UEN A Section 5
Installing the IED
57
Installation and commissioning manual