1. Change the magnitude and angle of the voltage to achieve impedances at test
points P1, P2, P3 and P4.
2. For each test point, check that the output signals START and STZx (where, x
is 1- 3 depending on the zone selected) are activated.
3. Signals TRIP and TRZx will be activated after operate time delay tZx for the
respective zone has elapsed.
Verifying quadrilateral characteristic
GUID-12731067-DB7D-4FEB-9529-40016BAC3159 v2
To verify zone quadrilateral characteristic, at least 10 points must be tested.
6
1
6
1
6
1
2
3
8
4
5
9
IEC15000199-2-en.vsdx
P5
P6
P7
P1
P2
P8 P9
P10
P3
7
P4
jX ()
R ()
IEC15000199 V2 EN-US
Figure 23: Commissioning test points for Quad non-dir characteristic
1.
RFFwZx
2.
ZxFwd
3.
ImpCharAng
4.
ZxFwd * cos(ImpCharAng)
5.
ZxFwd * sin(ImpCharAng)
6.
RFRevZx
7.
ZxRev
8.
ZxRev * cos(ImpCharAng)
9.
ZxRev * sin(ImpCharAng)
Where x = 1, 2 and 3.
1MRK 506 377-UEN C Section 10