10.9.4.9 Completing the test
SEMOD175185-374 v4
continue to test another function or end the test by changing the TESTMODE
setting to Off. Restore connections and settings to their original values, if they were
changed for testing purposes.
10.9.5 Single command, 16 signals SINGLECMD
SEMOD172444-5 v3
For the single command function block, it is necessary to configure the output
signal to corresponding binary output of the IED. The operation of the single
command function (SINGLECMD) is then checked from the local HMI by
applying the commands with Mode = Off, Steady or Pulse, and by observing the
logic statuses of the corresponding binary output. Command control functions
included in the operation of different built-in functions must be tested at the same
time as their corresponding functions.
10.9.6 Interlocking
M11755-2 v8
Prepare the IED for verification of settings outlined in Section "Preparing the IED
to verify settings".
Values of the logical signals are available on the local HMI under Main menu/
Tests/Function status/Control/Apparatus control/Interlocking. The Signal
Monitoring in PCM600 shows the same signals that are available on the local HMI.
The interlocking function consists of a bay-level part and a station-level part. The
interlocking is delivery specific and is realized by bay-to-bay communication over
the station bus. For that reason, test the function in a system, that is, either in a
complete delivery system as an acceptance test (FAT/SAT) or as parts of that
system.
10.9.7 Transformer energizing control XENCPOW
GUID-86397338-8127-4829-8F8F-2F46589D3A1F v1
Prepare the IED for verification of settings outlined in Section
"Preparing the IED
to verify settings".
10.9.7.1 Verifying the signals and settings
GUID-06B83982-6C5C-4036-B91B-F6AD37A00187 v1
The voltage injection can be done using a common test equipment.
Verifying the high and low voltage settings
ULowLimit
and
UHighLimit
GUID-281E55ED-B3FD-41E6-B895-6F537BD66087 v2
1. Supply the IED with rated voltage value.
2. Decrease the voltage slowly and wait for 300 ms until the ULOW signal
appears.
3. Compare the voltage value with the set voltage low limit value.
Section 10 1MRK 506 377-UEN C
Testing functionality by secondary injection
152 Railway application RER670 2.2 IEC
Commissioning manual