EasyManua.ls Logo

ABB RER670 - Section 6 Establishing Connection and Verifying the SPA;IEC Communication; Entering Settings; Entering SPA Settings; Entering IEC Settings

ABB RER670
216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 6 Establishing connection and verifying the
SPA/IEC communication
6.1 Entering settings
M11735-2 v2
If the IED is connected to a monitoring or control system via the rear SPA/IEC103
port, the SPA/IEC103 port has to be set either for SPA or IEC103 use.
6.1.1 Entering SPA settings
M11735-7 v6
The SPA/IEC port is located on the rear side of the IED. Two types of interfaces
can be used:
plastic fibers with connector type HFBR
glass fibers with connector type ST
When using the SPA protocol, the rear SPA/IEC port must be set for SPA use.
Procedure:
1. Set the port for SPA use on the local HMI under Main menu /
Configuration /Communication /Station communication/Port
configuration/SLM optical serial port/PROTOCOL:1. When the
communication protocol is selected, the IED is automatically restarted, and
the port then operates as a SPA port.
2. Set the SlaveAddress and BaudRate for the rear SPA port on the local HMI
under Main menu/Configuration/Communication/Station
communication/SPA/SPA:1. Use the same settings for these as is set in the
SMS system for the IED.
6.1.2 Entering IEC settings
M11735-32 v6
The SPA/IEC port is located on the rear side of the IED. Two types of interfaces
can be used:
plastic fibers with connector type HFBR
glass fibers with connector type ST
When using the IEC protocol, the rear SPA/IEC port must be set for IEC use.
Procedure:
1MRK 506 377-UEN C Section 6
Establishing connection and verifying the SPA/IEC communication
Railway application RER670 2.2 IEC 49
Commissioning manual

Table of Contents

Other manuals for ABB RER670

Related product manuals