If the IEC/UCA 61850-9-2LE communication is interrupted during
current injection, the report tool in PCM600 will display the current
that was injected before the interruption.
IEC10000032-1-en.vsd
IEC10000032 V1 EN-US
Figure 10: PCM600 report tool display after communication interruption
9.7 Testing the protection functionality
GUID-125B6F28-D3E5-4535-9CD6-6C056B79F496 v2
Each protection function must be tested individually by secondary injection.
Verify operating levels (trip) and timers.
Verify alarm and blocking signals.
Use the disturbance handling tool in PCM600 to evaluate that the protection
function has received the correct data and responded correctly (signaling and
timing).
Use the event viewer tool in PCM600 to check that only expected events have
occurred.
Section 9 1MRK 506 377-UEN C
Testing IED operation
66 Railway application RER670 2.2 IEC