EasyManua.ls Logo

Abe CraftCan 15 - Page 58

Abe CraftCan 15
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
American Beer Equipment 2001 SW 6
th
St.
Lincoln, NE 68522
57
achieve
desired
throughput rate, while also working to avoid errati
c
or
overly aggressive rate that "throws” cans.
11 Ensure lid stack sleeve is full. (Spare Parts, Figure 6, # 24)
12
Ensure supply cans are ready to exit the de
-
palletizer or feed
table and
enter the canning line.
13
Perform Seam Check on three cans per seamer. Remove cans and conduct
tear-down. Measure to ensure seam is in spec. Record data on can
checklist (12. Double Seam Specs).
14 Ensure cans are present on the seamer pucks. (Spare Parts, Figure 2, #16)
Task
Number
* Detailed explanation/comments required for any task not completed or partially completed
If a fastener is loose, the threads must be cleaned (with a cleaner/degreaser
-
Loctite Cleaner and
Degreaser is recommended) and Blue Loctite (242,243, or similar) must be applied.