4. Installation:
4.1. General installation Instructions
NOTES:
By law, this boiler must be installed by a competent trained and or licensed gas-heating technician, or gas supplier. It
is in your own interest and that of safety to ensure that the local law is complied with. The following codes must be
adhered to when the Absolute Boiler is installed:
-CSA B149 gas installation code & ANSI Z223.1 / NFPA 54 gas code.
In addition to the above regulations, this boiler must be installed in compliance with:
- National & local building codes
- ASME CSD-1 as required
- CSA & NEC electrical codes
- Other Regulations
WARNING
All Absolute boilers are CSA certied, and must not be modied or installed in any way contrary to these “Installation
and operations manual.
4.2 Delivery and installation
The Absolute boiler is supplied fully assembled, plastic wrapped and crated on a pallet. The Unit should be completely
inspected for evidence of shipping damage and shipping completeness at time of receipt. From the carrier and BEFORE
the bill of ladling is signed. The carrier MUST be notied immediately if any damage is detected.
The overall dimensions of the crate are 36 inches [92cm] wide, 70 inches [178 cm] high with the length of 50 1/8
(127 cm). At the base of the packaging is a 30” [76 cm] wide pallet enabling it to be transported with a pallet truck,
forklift truck or 4-wheel transport boards. Excluding the crate, the boiler is 22 1/16 [56 cm] wide complete with casing
panels, the boiler will t through most standard doors (minimum door opening width 34.5” [87 cm]. The boiler itself
has 2 wheels so that, once the packaging has been removed, it can easily be moved around on a smooth surface. The
packaging lid includes a rocking ramp, which can be used to negotiate obstacles such as doorsteps and small plinths.
Once in position the boiler is xed into position using the tted jacking bolts which both raise the wheels of the ground
and level the boiler. Technical documentation is supplied in a holder on the inside of the boiler casing (beneath the
instrument panel). A number of small loose components, such as the 4 support pads, siphon, and relief valve, for the
boiler have been placed in a box marked accessories near the ue gas discharge