EasyManua.ls Logo

Absolute ABS-1500 - Water Treatment

Absolute ABS-1500
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Absolute Boilers ABS 1500-2000-2500-3000-4000
34
4.6.3 Water treatment
The heat exchanger is manufactured from aluminum alloys which will provide many years of excellent service, if
maintained properly. All heat exchangers require proper water conditions to remain ecient and function properly.
Failure to do so will lead to premature failures within the heat exchanger. The system should be lled with mains, cold
water (this will usually have a pH of between 7 and 8). Pressurized installations with a boiler/system content ratio of
1:10 or less should not require water treatment, provided the following conditions apply:
1. The system is ushed thoroughly to remove all uxes and debris and lled completely once.
2. Make up water is limited to 5% per annum.
3. The hardness of the water shall conform to the water quality document requirements
4. All scale deposits will reduce the eciency of the boiler and should be prevented. However provided the above
is complied with any scale produced will not be too detrimental to the boiler eciency and will not reduce the
anticipated life expectancy of the boiler.
WARNING
The boiler water shall be maintained between 7 and 8 ph at all times. Failures to do so will nullify any and all warranties
implied
Suitable chemicals and their uses should be discussed with a specialist water treatment company before to carrying out
any work. The specications of the system and the manufactures recommendations must be taken into account, along
with the age and condition of the entire system. New systems should be ushed thoroughly to remove any traces of
ux debris grease and metal swarfs generated during installation and assembly of a new system
For old systems to ensure any black metallic iron oxide sludge and their corrosives residues are removed, again by
power ushing, ensuring that the entire system is drained and completely clean of all possible debris
Minimum piping layout

Table of Contents