3. Touch the Diagnostics test button, screen changes to the Modulating Test window
4. Press the Maximum Modulation button (High re position), this will force the boiler into the High re position.
Once in the High re postion and stable conditions are reached check the following:
a. Check combustion (see table) for factory and eld combustion limits
b. Adjust main ow (High re) as necessary via shutter adjustment slotted screw ±
c. Measure breeching/vent draft condition
d. Check ame signal on operation overview window and observe ame condition via sight glass.
5. Press the Minimum Modulation button, this will force the boiler into the Low re position Once in the Low re
postion and stable conditions are reached check the following:
a. Check combustion (see table) for factory and eld combustion limits
b. Adjust oset (Low re) as necessary via Oset 2.5mm hex screw ±
c. Measure breeching/vent draft condition
d. Check ame signal on operation overview window and observe ame condition via sight glass.