EasyManua.ls Logo

Addison PR Series - Cooling Check (Continued)

Addison PR Series
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 5 of 7
COOLING CHECK
Compressor Circuit #2:
Suction Pressure:
Discharge Pressure:
Liquid Pressure:
Superheat:
Subcooling:
Compressor 2A AMPS:
Compressor 2B AMPS:
Suction Temp:
Discharge Temp:
Liquid Temp:
To Calculate Superheat: Convert suction pressure to saturation temperature,
then subtract the suction line temperature.
L1
L1
L2
L2
L3
L3
Saturation Temp:
Saturation Temp:
To Calculate Subcooling: Convert liquid line pressure to condensing
temperature, then subtract the liquid line temperature.
Condenser Fans:
Condenser Fan 1 AMPS:
Condenser Fan 2 AMPS:
Condenser Fan 3 AMPS:
Condenser Fan 4 AMPS:
Condenser Fan 5 AMPS:
Condenser Fan 6 AMPS:
L1
L1
L2
L2
L3
L3
L1
L1
L2
L2
L3
L3
L1
L1
L2
L2
L3
L3
Hot Gas Bypass/Hot Gas Reheat:
Hot Gas Bypass:
Hot Gas Reheat:
Unloading Switch Settings:
Cut In:
Cut Out:
Condenser Air Temperature:
Inlet °F
Outlet °F:
Valve Begins to Open at 105PSI - Fully Open at 100PSI
Staged: Modulating: SAT °F:
Superheat and Subcooling readings must be taken with the reheat circuit disabled, and in the cooling
mode. Additionally, Subcooling circuit must be energized and open.
Additional Charge:
Added or Subtracted - Circuit 1:
Refrigerant Oil Added - Circuit 1: Yes No
Amount of Oil Added (Ounces):
Type of Oil Added:
Additional Charge:
Added or Subtracted - Circuit 2:
Refrigerant Oil Added - Circuit 2: Yes No
Amount of Oil Added (Ounces):
Type of Oil Added:
Variable speed or digital
compressors must be operated
at 100%.
PR Series Unit Start-Up Form

Table of Contents

Related product manuals