EasyManua.ls Logo

Airoptic GasEye - Page 32

Airoptic GasEye
254 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
32
GasEye Cross Duct SG and MG
Operat
ing instructions,
0
5
/202
1
Figure 23. Alignment tool kit interior.
Standard equipment that is found in this kit consists of:
1. Light source (green LED torch)
2. Aiming tool – tool base with fine alignment piece
3. Coarse alignment tool
4. Allen key for adjustment screws (6 mm size)
5. Batteries for LED torch (3xAAA) and dry grease for flange adapter gasket
6. Spare flange adapter gasket
7. Clamp ring

Table of Contents