OPERATING INSTRUCTIONS
18
Step 3: Loosen transport rolls
Turn the tension lever to move the transport rolls
apart.
Step 4: Release Teflon belts
Push the lower of the two guiding rollers to the
right against the spring to release the tension
for the lower Teflon belt.
Remove the slackened Teflon belt from the rollers.
Step 5: Insert new Teflon belts.
Place the new Teflon belt over the left transport
rollers
And press the roll again to the right against the
spring until the Teflon belt can be placed on the
right roll.